Fairness & Escrow Governance

Transparent Disputes &
Escrow Protection.

When work expectations differ, Bouul freezes escrow funds safely while executing a 3-step evidence review process that protects both clients and verified trade contractors.

Step 1: Immediate Escrow Freeze

Tapping "Dispute Booking" instantly freezes escrow funds. Neither party can withdraw money until evidence is reviewed.

Step 2: 48-Hour Evidence Upload

Client and contractor submit high-res photos, pre-diagnostic chat logs, and initial scope briefs directly inside the app.

Step 3: Peer Jury Signoff

Senior certified trade inspectors evaluate technical evidence against PIRB/SANS building standards for fair payout release.

Simulated Peer Jury Verdict Case

Test Real Dispute Scenarios Live

Click any case scenario below to inspect customer claims, contractor defense evidence, and how our trade peer jury awards escrow payouts.

Trade Category: Plumbing & Roofing

Scenario #1: Geyser Install vs Roof Tile Leak

Locked Escrow: R3,800
👤 Client Dispute Claim:

"Client claims ceiling leak returned 2 days after new 150L geyser was installed, demanding full refund."

🛠️ Contractor Technical Defense:

"Plumber claims new geyser installation passed PIRB pressure test. Leak is caused by cracked roof tiles above ceiling."

Uploaded Technical Evidence Vault (48h Inspection Window)

📸 Photo: Water stain on bedroom ceiling drywall (uploaded 48h post-install)
📜 PIRB Certificate #P-884021 + 6.0 Bar Hydrostatic Pressure Test Pass Log
💬 Zola Chat Memory: 'Customer declined R650 roof tile sealing add-on prior to dispatch'

Verdict: 85% Escrow Released to Contractor

Audited by: Verified PIRB Trade Auditor #7740
85% Pro/15% Client

"PIRB Senior Inspector verified geyser pressure test was 100% compliant. Zola pre-brief logs proved roof repair was declined by client prior to booking."

Zero Chargeback Fraud

How We Protect Verified Pros & Clients

Scope Change Safeguard

Contractors cannot be penalized for unquoted extra work requested verbally on site. Extra tasks require an in-app add-on approval.

Workmanship Guarantee

If work fails pressure tests or safety checks, the contractor must rectify the issue before escrow funds are released.